HEAVY JET

Falcon 2000LX

~8–14
Passenger
~4,000 nm
Range
~540 mph
Cruising Speed
~131 cu ft
Baggage Capacity
overview

DASSAULT FALCON 2000LX

The Dassault Falcon 2000LX is a long-range large-cabin business jet known for its aerodynamic efficiency and balanced performance profile. As an evolution of the Falcon 2000 series, the 2000LX introduced blended winglets to extend range and improve fuel efficiency.

Designed for transcontinental and international regional missions, the Falcon 2000LX combines performance, runway capability, and refined cabin comfort.

 Interior

A SPACIOUS LARGE-CABIN LAYOUT  BUILT FOR EXECUTIVE MISSIONS

Seating for 8–14 passengers
Flat-floor cabin design
Multi-zone cabin configuration
Large Falcon signature windows
Fully enclosed aft lavatory
Advanced cabin management system
Forward galley area
Spacious baggage compartment
Speed and Performance

LONG-RANGE EFFICIENCY  WITH SHORT-RUNWAY FLEXIBILITY

The Falcon 2000LX delivers strong cruise performance with improved range over earlier variants, while maintaining the ability to operate from shorter runways compared to many aircraft in its class.

Its efficient wing design and advanced avionics platform contribute to stable and balanced long-range performance.

Cruising speed: Approx. 540 mph (Mach 0.80–0.84)
Range: Up to 4,000 nautical miles
Maximum altitude: Up to 47,000 feet
Short-field performance capability
Efficient twin-engine operation
Main Advantages
Large multi-zone cabin
Transcontinental range capability
Short-runway flexibility
Efficient aerodynamic design
Strong fuel efficiency profile
Corporate and executive mission ready
High-altitude cruise performance
Balanced long-range efficiency
Established Falcon platform
Recognized resale demand
Specifications
Aircraft Type
Large Cabin Business Jet
Year of Manufacture
2009–Present
Range
Up to 4,000 nautical miles (7,408 km)
Maximum Altitude
Up to 47,000 feet (14,326 meters)
Cruising Speed
Approx. 540 mph
Luggage Capacity
Approx. 131 cubic feet
Seating Capacity
8–14 passengers
Interior Height
6 feet 2 inches
Interior Width
7 feet 8 inches
Cabin Details
Length
31 feet
Width
7.8 feet
Height
6.2 feet
frequently asked questions
How many passengers can the Falcon 2000LX seat?

The aircraft typically accommodates between 8 and 14 passengers depending on configuration.

What is the range of the Falcon 2000LX?

The Falcon 2000LX offers a maximum range of approximately 4,000 nautical miles under standard operating conditions.

Is the Falcon 2000LX considered a large-cabin jet?

Yes. It is classified as a large-cabin business jet due to its cabin dimensions and long-range capability.

Can the Falcon 2000LX operate from shorter runways?

Yes. One of its advantages is strong short-field performance compared to many aircraft in its category.

What distinguishes the Falcon 2000LX from earlier models?

The addition of blended winglets improved range and overall aerodynamic efficiency compared to previous Falcon 2000 variants.